8/19 | Hot Air Connection at Fitting

Original image

DATES

September 2-4, 2006

COMPANY

AMERICAN INTERNATIONAL TILE
Elk Grove Village, IL

WORKING DAYS

3 Days

PERSONNEL

3 Workers

PICTURE
DESCRIPTION

The heat source hose is run from the high capacity heater to the above ground tee where the potable water and fire suppression split. The hot air is pulled by the vactor from this point 6-1/2 feet below grade and though the 80 foot pipe run under the floor to the outside access pit.