Case History: College of Creative Studies
Location
Detroit, Michigan
General
Description
College residential building built circa 1928
Restored one set of riser servicing 24 bathrooms
each with toilet, lavatory, and bath/shower
Risers
Material
Galvanized
Condition
Poor to Fair
Type
Inverted - Gravity Fed
from Water
Tank in Penthouse
Pipe Diameters and Transitions
Hot
2" - 1-1/2" - 1-1/4" - 1"
Cold
2-1/2" - 2" -
1-1/2" - 1-1/4" - 1"
Turns None
Laterals
Material
Galvanized
Condition
Poor to Severely Deteriorated
Pipe Diameters and Transitions
Hot
1/2" - 3/4"
Cold
1/2" - 3/4" - 1"
Turns Multiple 90s
and 45s
Restored Life Expectancy
Life expectancy of restored riser and laterals is
50 to 70 years with no further mineral build up
or corrosion
Benefits
Increased Life ~ Minimal Demolition/Restoration
Restored Pipe Diameter ~ Brown Water Eliminated
Barrier Epoxy Coating Prohibits Mineral Build Up